Devils Lake, North Dakota
This project consisted of 50,000 CY of common excavation, 11,000 tons of Rip Rap, 28,000 square feet of sheet piling, dewatering including coffer dam construction and a concrete water control structure that included a stop log system. The project obstacles included winter conditions, dewatering and muck excavation which involved swamp mats.