< All Projects

Puppy Dog Coulee

  • Owner
    City of Minot
  • Engineer
    Ackerman-Estvold
  • Completion Date
    2025
  • Contract Value
    $19,843,955.70
Highlights
  • 1,680 LF of double 12’ x 8’ box culvert
  • 826 LF of storm sewer
  • 1,000 LF of sanitary sewer
  • 140 LF of water main
  • 4,250 LF of curb & gutter replaced
  • 3,800 tons of asphalt pavement
Summary

The project involved construction of storm sewer improvements and reconstruction of roadways associated with the Puppy Dog Coulee system. Work included installation of major storm and sanitary sewer infrastructure, water main improvements, and full roadway and curb and gutter reconstruction. The project also incorporated coordination with local stakeholders, site restoration, and ancillary work necessary to complete the system efficiently and sustainably.

Excavators dig among concrete, plastic sheets, and dirt piles.
Construction site with concrete blocks, black tarps, equipment; info overlay.
Workers install curbs by road; excavator and materials present.
Construction site with materials, safety cones, worker, tape, trees.
Yellow excavator on dirt at a construction site in Minot.
Minot, ND construction site: excavator, dirt piles, cones, plastic cover.
Construction site with machinery, rock slope, gravel paths, overcast sky.
Concrete culvert with rock lining beneath road near buildings.
Rocky stormwater drainage by culvert, barriers, buildings behind.