Brickyard Infrastructure

  • Owner
    ACME CD, LLC
  • Engineer
    Confluence Builders, LLC
  • Completion Date
    Fall, 2026
  • Contract Value
    $9,903,542.00
Highlights
  • 119 LF of 12’ x 10’ box culvert
  • 8,678 LF of Storm Sewer
  • 6,874 LF of Sanitary Sewer
  • 8,844 LF of Water Main
Summary

When complete, The Brickyard will be a dynamic, multifaceted community featuring luxury apartments and townhomes, as well as a vibrant mix of shopping, dining, entertainment, and a state-of-the-art sports center. Wagner’s scope of work includes the demolition of existing utilities and the installation of new sanitary, water, and storm systems. The project also encompasses construction of a detention pond system with forebays, a pond outlet structure, maintenance paths, a trickle channel, and a concrete apron overflow, along with a box culvert complete with headwalls, wing walls, reinforced concrete pipe (RCP), and railings.